Night works – Heaslip Road
Works to install new water and wastewater pipes on Heaslip Road, near Curtis Road, will commence early March 2026. Works will move progressively north, with completion expected mid 2027.
Additional works will also be undertaken on surrounding streets.
When: early April until late April 2026
Where: Heaslip Road, between Virgara Way / Saverio Boulevard and Fradd Road, Angle Vale
Hours of work: 7:00 pm – 6:00 am, Sunday to Friday
Key details:
- Heaslip Road will be closed to traffic between Max Fatchen Drive and Fradd Road at night, Sunday to Friday (local access maintained via Fradd Road)
- Heaslip Road will be reduced to a single lane past the work zone, between Virgara Way/Saverio Boulevard and Max Fatchen Drive, Sunday to Friday
- detours will be in place, please follow signage onsite
- outside of work hours, the road will be open with speed restrictions in place
- to reduce the overall construction time, work will occur in multiple locations along Heaslip Road
- some vibration, noise and dust are to be expected during these works during these works
- local and business access will be maintained at all times.
Detour 
Please note traffic arrangements may change depending on site conditions.
We will restore any impacted roads, footpaths or the environment as soon as it’s safe and practical to do so.
Thank you for your patience while we complete these essential works.